Flagship: Halleck Creek

Halleck Creek Highlights

Halleck Creek is a large, scalable resource with the potential to secure both the heavy and light rare earths needs for US industry, defense and innovation for +100-years.

Overview

Stage

Development

Location

Wyoming, USA

  • The Project deposit has a JORC resource estimate of 2.63 bn tonnes with grades of 3,292 ppm TREO
  • Halleck Creek is to be developed in two separate and independent phases:
    • Phase 1: The Cowboy State Mine (“CSM”), a 20-year life of mine, with robust economics showing a post-tax NPV10% US$558 mm and ~24% IRR; 
    • Phase 2: Development of Halleck Creek on Federal Land & Minerals, which has an 80-year plus mine life potential.
  • Speed to Come to Market: The CSM has the strategic advantage of a Wyoming State permit to mine process which is typically 2-3 years (vs. federal permits of +10 years). 
    • Strategic permitting advantage will enable the CSM to meet the immediate term needs of the rapidly growing US magnetics industry
  • Strong Government Support to date:
    • Received State of Wyoming grant of US$7.1 mm to help advance the development of the Cowboy State Mine
    • Received a non-binding letter of interest from the U.S. EXIM Bank for up to US$456 mm debt financing, covering all initial CSM capex

Scoping Study Overview

  • Study envisions scalable open pit mining operation
  • Robust project economics on the back of a large scalable resource, a low-strip ratio and competitive C1 cash costs
  • Project can be scaled to meet increased future market demand
  • CSM resources only accounts for ~20% of the larger Halleck Creek resource
Description Units 3 Mtpa Base Case
Mine Life (years) 20
Resource Size 3 (mt) 543
TREO Grade (ppm) 3,438
LOM Strip Ratio (bcm/t) 0.38
Processing Rate (mtpa) 3.0
Overall Recovery of REO Material (%) 67%
NdPr Eq. LOM Avg. Annual Production1 (kt) 2.79
NdPr Eq. LOM Production (kt) 57.92
NdPr Eq. LOM C1 Cash Cost1 (US$/kg) $35.58
Initial Capex2 (US$ mm) $456
Post-Tax NPV10% (US$ mm) $558
Post-Tax IRR (%) 24.0%

Source: 2025 Halleck Creek Updated Scoping Study Technical Report (ASX release February 24, 2025)\
Note: Study assumes US$91.0/kg NdPr, US$2.0/kg La, US$10.0/kg SEG, US$1,500.0/kg Tb and US$400.0/kg Dy.

  1. Excludes ramp-up year.
  2. Includes 20% contingency.
  3. Resource size and grade based only on CSM, a subset of the overall Halleck Creek Project. CSM accounts for ~20% of the overall Halleck Creek deposit.

Go To Updated Scoping Study News Release

MINERAL RESOURCE STATEMENT

In addition to the Halleck Creek deposit’s immense size and potential ability to support multi-generations of US domestic rare earths needs, the resource’s rare earth oxide distribution is heavily weighted toward key magnet elements, which account for ~26% of the total rare earth oxide (“TREO”) content. In particular, heavy rare earths account for ~11% of the TREO. 

    GRADE CONTAINED
  Tonnage TREO LREO HREO MREO TREO LREO HREO MREO
  (Mt) (ppm) (ppm) (ppm) (ppm) (kt) (kt) (kt) (kt)
Measured & Indicated 1,479 3,334 2,963 361 859 4,931 4,383 535 1,271
Inferred 1,147 3,239 2,878 361 837 3,716 3,302 414 960
Total Mineral Resource 2,627 3,292 2,926 361 850 8,647 7,685 948 2,231

Footnote:

1. 2025 Halleck Creek Updated Scoping Study Technical Report. See ASX release dated January 29, 2025 and February 24, 2025 for more details.

Note: TREO = Total Rare Earth Oxides, LREO = Light Rare Earth Oxides, HREO = Heavy Rare Earth Oxides, MREO = Magnet Rare Earth Oxides 

Value-Add Projects

La Paz background image
La Paz

171Mt JORC Resource estimate grading 391ppm TREO

Beaver Creek background image
Beaver Creek

TREO Grades 5.8% - 13.9%

Searchlight background image
Searchlight

Claims adjacent to the Mountain Pass mine